Riyang V500/V630 Powers Buenos Aires Water Project in Argentina

Riyang V500/V630 Powers Buenos Aires Water Project in Argentina

Summary

Argentina, Buenos Aires Water Supply System Upgrade

V500/V630 Manual Hydraulic Fusion Machines Ensure Reliable Operation

Buenos Aires Water Supply Project - Riyang Dual-Diameter Solution
Argentina, Buenos Aires Water Supply System Upgrade
V500/V630 Manual Hydraulic Fusion Machines Ensure Reliable Operation
Project Significance
• Serving 2 million residents
• 15km DN500/DN630 HDPE pipeline
• Crossing 7 administrative districts
Technical Innovations
Urban Challenges
• 2m daily groundwater fluctuation
• 1.5m existing pipeline clearance
Riyang Solutions
• Reliable fusion welding performance
• Stock spare parts through local agent
Key Outcomes
• Schedule Efficiency: 18 days ahead of plan
• Quality Assurance: Zero leakage in 1,240 joints
• Cost Efficiency: 42% operational cost reduction
Client Testimonial
"The Riyang poly welder's dual-diameter capability revolutionized our workflow. Their 24/7 support team once guided us through a pressure fluctuation issue at 2 am - truly unparalleled service."
— Lucía Fernández, Project Manager
Need HDPE Pipeline Installation Solutions?