V1000: Solving Lima's HDPE Pipe Welding Challenges

V1000: Solving Lima's HDPE Pipe Welding Challenges

Summary

Solving Large-Diameter HDPE Pipe Welding Challenges in High-Temperature Municipal Projects

V1000 Fusion Machine Case Study in Lima's Water Supply Upgrade

Solving Large-Diameter HDPE Pipe Welding Challenges in High-Temperature Municipal Projects
V1000 Fusion Machine Case Study in Limas Water Supply Upgrade
Project Overview
• Location: Lima, Peru
• Pipe Specifications: DN1000 HDPE (SDR21)
• Project Scale: 1.5km pipeline replacement
• Duration: 2 months (2023 rainy season)
Critical Challenges
• Temperature fluctuations of ±8°C with conventional fusion machines
• Daytime ambient temperature of 35°C
• 18% rework rate due to cold joint failures
V1000 System Solution
• Precision temperature control within ±5°C
• PeWeldBank Pro data logging system
• Dual-mode thermal compensation
Equipment Configuration
Component
Model
Key Specifications
Main Unit
V1000 (630-1000mm) 
Heating range: 210-230°C ±5°C
Data Logger
PeWeldBank
20,000 weld records storage
Performance Benchmarking
Metric
Conventional Fusion Machine 
V1000 System 
Improvement
First-pass Yield
82%
99.6%
+21%
Cycle Time per Joint
55 minutes
40 minutes
-27%
Technical Highlights
• Advanced fusion machine compliant with ISO 12176-4 standards
• Municipal-grade HDPE pipe welding solution
• Seismic-resistant butt fusion machine design